"Concerns over plans being ignored: We in York-South Weston are the Davids attempting to stop the Goliath that is Metrolinx from decimating our parks because of their decision to run the Eglinton Crosstown LRT above ground through the Eglinton flats instead of tunnelling it. This parkland is a designated Greenbelt zone with large swaths of mature urban forests; it also includes one of the city’s largest networks of sports fields in one of the most economically disadvantaged areas of the city."
Toronto Star publishes letter to the editor
Updated: Dec 6, 2022
Comments